Project Detail
Project Name
Central Avenue Bridge Rehab
Client
Kansas Department of Transportation. District One Area Three
Project Description
Major Bridge Repairs
Dates on Site
July 2007 through November 2008
Environmental Controls
Dust control, 100% containment
Specified Materials
Sherwin Williams : Zinc Clad III Organic Zinc Rich Epoxy Primer, Fast Clad HB Acrylic Finish Coat
Problem to Solve
Existing expansion joints had failed causing water leakage through joint system down onto structural steel support girders causing corrosion. Concrete repairs, joint replacement and steel coating were located over land, railroad tracks and water.
Work Scope
Perform 18,800 SF substructure repairs utilizing dry process shotcrete method and bridge deck repairs. Remove and replace existing expansion joint systems. Structural steel repairs. Abrasive blast and apply protective coating to structural steel located 10’ on each side of expansion joints.
Contact Us
Contact us via Email through our Contact Form...
|
Corporate Office: 14123 42nd Street NE |
|
Competitive Advantages
- High bonding capacity of $90 million
- Exceptional safety record with numerous safety awards
- A history of timely project completions
- Focus on partnering with owners and engineers
- Excelling with unique and difficult projects
- Rare capabilities
- Key equipment management
- Qualified applicator scheduling
- Fairly priced
- Emphasizing quality and value